Search

Search the World Map:

Or

Search by one or more criteria; the more terms you add, the narrower the search.

Name / Location:
Town/City:
State / Province:
Country:
Zip / Postal Code:
Categories:
Availability:
Situation:
Status:
Wheelchair Accessible:
Type:
Contact Last Name:
Material:
Designer:
Builder:

Tom Bass Regional Park

Museo Laberinto de las Ciencias y las Artes

San Luis Potosi, 78364, Mexico
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    52 444 1027800
  • Designer: Arquitectura/architecture: Fransisco Toledo Instalaci�n sonora/sound intervention: Alfredo Salom�n

Unity Way Church

Vista, California, 92083, United States
  • Availability
    Private
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    760-726-1224

Gajowka Eco Village

Gajowka, 59-630, Poland
  • Availability
    Appointment
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    +48 881452560

Private Property

Davenport, Florida, 33837, United States
  • Availability
    Appointment
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    863-207-0407

Calvary Presbyterian Church

Milwaukee, Wisconsin, 53233, United States
  • Availability
    Public
  • Situation
    Indoor
  • Portability
    Permanent
  • Phone
    414-271-8782

Centennial Barn

Cincinnati, Ohio, 45215, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    513-761-1697
  • Designer: Community group

Barium Springs

Troutman, North Carolina, 28010, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    704-872-4157
  • Designer: Jim Branden

EarthForce Healing Center

Lunenburg, Nova Scotia, B0R 1G0, Canada
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    902-541-3342

Saint Thomas Rutherford Hospital

Murfreesboro, Tennessee, 37129, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent

Elko Peace Park

Elko, Nevada, 89801, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Designer: Sarah Sweetwater

Chico Community Labyrinth

Chico, California, 95926, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Designer: Labyrinth Co. and Marilynn Jennings

Huston-Brumbaugh Nature Center

Minerva, Ohio, 44657, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    330-823-7487
  • Designer: Karen Santee

United Methodist Church

Fairfield, Iowa, 52556, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    641-472-4303
  • Designer: Marty Cain

Thomaston Yoga Studio – The Annex in Waldoboro

Waldoboro, Maine, 04572, United States
  • Availability
    Appointment
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    207-319-6301
  • Designer: David W. Kristiansen

Moonstone Path

London, Ontario, N6K 1C9, Canada
  • Availability
    Private
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    519-473-6600

15108 Cullen Blvd
Houston
Texas, 77047
United States

View Map View Map

Located in Tom Bass Park underneath Oak Trees south of the Tom Bass Park Community Center at the Cullen Blvd entrance to the park. This labyrinth is included in the International Legacy Labyrinth project.

  • Contact:

    Jay Stailey
    Phone: 713-498-0497
    Email: [email protected]
    View Website

  • Type:

    Contemporary
    7 circuit Concentric design on outside 5 circuits with spiraling central circuits.

  • Availability:

    Public

  • Situation:

    Outdoor

  • Status:

    Permanent

  • Material:

    Brick Paver

  • Material Description:

    grass paths

  • Designer:

    Reginald Adams and Jay Stailey

  • Builder:

    Reginald Adams

  • Wheelchair Accessible:

    No

  • Schedule Times:

    Sun-up to 9 p.m.

  • Size:

    42 foot diameter

  • Date installed:

    August 25, 2018