Search

Search the World Map:

Or

Search by one or more criteria; the more terms you add, the narrower the search.

Name / Location:
Town/City:
State / Province:
Country:
Zip / Postal Code:
Categories:
Availability:
Situation:
Status:
Wheelchair Accessible:
Type:
Contact Last Name:
Material:
Designer:
Builder:

The Harmony Labyrinth

The Wellness Spa of High Springs

High Springs, Florida, 32643, United States
  • Availability
    Private
  • Situation
    Indoor
  • Portability
    Portable
  • Phone
    386-454-8889

Revolution

Kansas City, Missouri, 64127, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    816-931-1858
  • Designer: Chris Brennan Homiak

Wind Song Bed & Breakfast

Little Swanport, Tasmania, 7190, Australia
  • Availability
    Appointment
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    +61 3 6257 7583
  • Designer: Tom Teniswood

The People’s Church of Kalamazoo

Kalamazoo, Michigan, 49009, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    269-375-3262
  • Designer: Tomme Maile and Dale Abbott

St. Paul’s United Methodist Church

Papillion, Nebraska, 68046, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    402-339-3308

Estacada Public Library

Estacada, Oregon, 97023, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    503-789-5010
  • Designer: Stephen Shibley

All Saints – Sharon Chapel Episcopal Church

Alexandria, Virginia, 22310, United States
  • Availability
    Appointment
  • Situation
    Indoor
  • Portability
    Portable
  • Phone
    703-960-4808
  • Designer: Labyrinth Enterprises

Sturgis First United Methodist Church

Sturgis, South Dakota, 57785, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    605-720-5578
  • Designer: Paul Campbell, Cathie Bishop

South Lake Hospital

Clermont, Florida, 34711, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    352-394-4071

Christ Evangelical Lutheran Church

Santa Fe, New Mexico, 87505, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    505-983-9461

First United Methodist Church

Palo Alto, California, 94301, United States
  • Availability
    Appointment
  • Situation
    Indoor
  • Portability
    Portable
  • Phone
    650-323-6167
  • Designer: Veriditas labyrinth team

Private Property

Corrales, New Mexico, 87048, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    505-899-2772
  • Designer: Traditional

Private Property

Placitas, New Mexico, 87043, United States
  • Availability
    Private
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    505-867-4117
  • Designer: Traditional

Rosendals Tradgard

Stockholm, 11521, Sweden
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    08-6561665, 070-3252426
  • Designer: Katarina Mark

Church of the Ascension

Norfolk, Virginia, 23505, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    757-423-6715
  • Designer: Frank Holton

The Harmony Labyrinth In Ormond Beach Central Park

Ormond Central Park
Ormond Beach
Florida, 32173
United States

View Map View Map

On the north side of Hammock Lane, that runs E-W between Orchard Street and Old Kings Rd., the Harmony labyrinth is in Ormond Central Park.

  • Contact:

    Carol Bertrand
    Phone: 386-672-5005
    Email: [email protected]

  • Type:

    Medieval
    An eleven circuit labyrinth on a concrete pad in the style of Chartres without the the rosette in the center or the ornamentation.

  • Availability:

    Public

  • Situation:

    Outdoor

  • Status:

    Permanent

  • Material:

    Concrete

  • Material Description:

    acrylic coating

  • Designer:

    Jim Bertrand

  • Builder:

    The Labyrinth Project

  • Wheelchair Accessible:

    No

  • Schedule Times:

    The park is open during daylight hours

  • Size:

    50 feet diameter

  • Date installed:

    September 14, 2009