Search

Search the World Map:

Or

Search by one or more criteria; the more terms you add, the narrower the search.

Name / Location:
Town/City:
State / Province:
Country:
Zip / Postal Code:
Categories:
Availability:
Situation:
Status:
Wheelchair Accessible:
Type:
Contact Last Name:
Material:
Designer:
Builder:

St. Paul United Methodist Church

Taypikala Lago Hotel

Puno, 051, Peru
  • Availability
    Private
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    051-051-792252

Scarritt Bennett Center

Nashville, Tennessee, 37212, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    615-340-7500
  • Designer: Battle Beasely

St. Andrew Lutheran Church

Vancouver, Washington, 98662, United States
  • Availability
    Public
  • Situation
    Indoor
  • Portability
    Portable
  • Phone
    360-892-7160
  • Designer: Jim Stender

The Turf Labyrinth

St. Martin by Looe, Cornwall, PL13 1NZ, England
  • Availability
    Appointment
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    01503-262671

Spiritworks

Pittsburgh, Pennsylvania, 15221, United States
  • Availability
    Appointment
  • Situation
    Indoor
  • Portability
    Portable
  • Phone
    412-999-1912
  • Designer: St. Louis Labyrinth Project – Robert Ferre

Kashi Ashram

Sebastian, Florida, 32958, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    772 532-5769
  • Designer: Kailash Shankara Jaya

Pathways of Transformation

Pueblo West, Colorado, 81007, United States
  • Availability
    Appointment
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    719-549-2337
  • Designer: Carol Foust

Maxwell Community Hub

Eugene, Oregon, 97401, United States
  • Availability
    Appointment
  • Situation
    Outdoor
  • Portability
    Permanent
  • Designer: Dale Dick

Morrow First United Methodist Church

Morrow, Georgia, 30260, United States
  • Availability
    Private
  • Situation
    Outdoor
  • Portability
    Permanent
  • Designer: Rubin Barker, Eagle Scout

NW Reno Flood Basin

Reno, Nevada, 89503, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Designer: Pamela Dallas

Hagal Farm

Bantry, Ireland
  • Availability
    Appointment
  • Situation
    Outdoor
  • Portability
    Permanent
  • Designer: Fred Wieler

Pure Intentions

Bellevue, Iowa, 52031, United States
  • Availability
    Appointment
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    563-872-5996
  • Designer: Toby Evans

Guildford Cathedral

Guildford, Surrey, GU2 7UP, England
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent

Trinity United Church

Vernon, British Columbia, V1T 6M1, Canada
  • Availability
    Appointment
  • Situation
    Indoor
  • Portability
    Permanent
  • Phone
    250-545-0797

Galilee Centre

Arnprior, Ontario, K7S 2P6, Canada
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    Galilee Office: 613-623-4242; Home Office: 613-746-8234

1001 Pierre Avenue
Shreveport
Louisiana, 71103
United States

View Map View Map

Located in the Church parking lot. This is the first parking lot labyrinth in Shreveport, and is the vision of Rev. Josephine M. Franklin in honor of her mother, Mrs. Lola B. Johnson, a resident of Allendale, who lives to the age of 105. The project was overseen by Prof. Thomas Moran (Centenary College) in collaboration with Pastor Dr. Joseph Whalen and Mr. Fred Williams, Chairman of the Trustees of St. Paul.

  • Contact:

    Rev. Dr. Joseph Whalen Jr. (Pastor)
    Phone: 318-424-4953
    View Website

  • Type:

    Medieval
    Chartres replica

  • Availability:

    Private

  • Situation:

    Outdoor

  • Status:

    Permanent

  • Material:

    Painted Concrete

  • Designer:

    Designed and by Allison “Dani” Kimmey, a Senior at Centenary College

  • Builder:

    Painted by Dani and Conner, Centenary College, Shreveport

  • Wheelchair Accessible:

    Yes

  • Schedule:

    Call

  • Schedule Details:

    Open to public from dawn to dusk

  • Date installed:

    Began on 13 September 2025 and church members and students from Centenary worked together over several weeks to complete the project.