Search

Search the World Map:

Or

Search by one or more criteria; the more terms you add, the narrower the search.

Name / Location:
Town/City:
State / Province:
Country:
Zip / Postal Code:
Categories:
Availability:
Situation:
Status:
Wheelchair Accessible:
Type:
Contact Last Name:
Material:
Designer:
Builder:

Mount Zion United Methodist Church

St. John’s United Church of Christ

Chambersburg, Pennsylvania, 17202, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    717-263-8593

St. Francis Episcopal Church

Rio Rancho, New Mexico, 87124, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    505-896-1999
  • Designer: Brotherhood of St. Andrew (The Episcopal Church)

The Gayton Kirk Presbyterian Church

Henrico, Virginia, 23238, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    804-741-5254

Western Michigan University – College of Health and Human Services

Kalamazoo, Michigan, 49008, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent

Siempre Verde Retreat

Manglaralto, 090150, Ecuador
  • Availability
    Private
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    +59 3999613472

Harmony Farm

Perry, Kansas, 66073, United States
  • Availability
    Appointment
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    785-813-3451
  • Designer: Paul Rudy

St. Gregory’s Episcopal Church

Littleton, Colorado, 80128, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    303-979-5236

Labirinto

Trento, 38122, Italy
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Designer: based on a design by Sebastiano Serlio from 1537

The Peoples Church

East Lansing, Michigan, 48823, United States
  • Availability
    Appointment
  • Situation
    Indoor
  • Portability
    Permanent
  • Phone
    517-332-5073

Las Brisas de Cuyútlan

Cuyútlan, Colima, 28350, Mexico
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    +52 314 165-3404

Dunbrody Abbey

Dunbrody, Campile, Co. Wexford, Ireland
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    086 275 9149

Walker Century Farms

Anderson, South Carolina, 29621, United States
  • Availability
    Appointment
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    864-940-4503
  • Designer: Jeff Saward

Art and Soul Lab

Woodland Hills, California, 91365, United States
  • Availability
    Appointment
  • Situation
    Indoor
  • Portability
    Portable
  • Phone
    747-248-7878

Christ Episcopal Church

Walnut Cove, North Carolina, 27052, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    336-591-7727
  • Designer: Nathan Wiles

Saint John Henry Newman Catholic Church

Warrington, Cheshire, WA4 1JE, England
  • Availability
    Appointment
  • Situation
    Indoor
  • Portability
    Permanent
  • Phone
    01925 634849

1485 Craig Road
St. Louis
Missouri, 63146
United States

View Map View Map

Matthew Beyes, an exceptional scout from Mount Zion has accomplished a great feat by creating, designing and constructing a prayer labyrinth as his Eagle Scout project. The Prayer Labyrinth is 48 feet in diameter and sits 20 feet off of the parking lot. The total area of the Labyrinth is 1809 square feet. The pathway is made out of a dark colored gravel while the edging stone is a tan colored brick. It took a total of 135 man hours to build the Labyrinth while a total of 22 people worked throughout the day of May 9, 2015. The Labyrinth is a great way for the congregation and community to strengthen their spiritual needs and the labyrinth provides an avenue to make that happen.

  • Contact:

    Glenn Wintemberg
    Email: [email protected]
    View Website

  • Type:

    Medieval
    7-circuit

  • Availability:

    Public

  • Situation:

    Outdoor

  • Status:

    Permanent

  • Material:

    Brick Paver

  • Material Description:

    gravel

  • Designer:

    Matthew Beyes

  • Builder:

    Matthew Beyes and others, Eagle Scout Project

  • Wheelchair Accessible:

    No

  • Schedule:

    Always Open

  • Size:

    48 feet diameter

  • Date installed:

    May 2015