Search

Search the World Map:

Or

Search by one or more criteria; the more terms you add, the narrower the search.

Name / Location:
Town/City:
State / Province:
Country:
Zip / Postal Code:
Categories:
Availability:
Situation:
Status:
Wheelchair Accessible:
Type:
Contact Last Name:
Material:
Designer:
Builder:

Mount Zion United Methodist Church

The Gearach

Isle of Islay, PA48 7UB, Scotland
  • Availability
    Appointment
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    01496-850120

Anacortes Parks Foundation

Anacortes, Washington, 98221, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    360-293-7837
  • Designer: The Labyrinth Company

Unitarian Universalist Community Church of Glen Allen

Glen Allen, Virginia, 23059, United States
  • Availability
    Public
  • Situation
    Indoor
  • Portability
    Portable
  • Phone
    804-752-6005
  • Designer: The Labyrinth Company

First Presbyterian Church of Tracy

Tracy, California, 95376, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    209 835-3247
  • Designer: Kyle Vander Ploeg, Eagle Scout project

Bali Rica

Ojochal, 10000, Costa Rica
  • Availability
    Appointment
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    +506-8847-6911

Highlands Presbyterian Camp & Retreat Center

Lyons, Colorado, 80540, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    303-747-2888
  • Designer: Dave Strom

Unity Center of Vero Beach

Vero Beach, Florida, 32960, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    772-562-1133

Singing Sands Inn

Kingsboro, Prince Edward Island, C0A 2B0, Canada
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Designer: Don and Alexandra McCallum

Niantic Community Church

Niantic, Connecticut, 06357, United States
  • Availability
    Private
  • Situation
    Indoor
  • Portability
    Portable
  • Phone
    (860) 739-6208
  • Designer: The Labyrinth Company

Chislehurst Methodist Church

Chislehurst, Kent, BR7 5LX, England
  • Availability
    Appointment
  • Situation
    Indoor
  • Portability
    Permanent
  • Phone
    020 8468 7695
  • Designer: Jeff Saward

The Anglican Parish of Euroa

Euroa, Victoria, 3666, Australia
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    +61 357951335
  • Designer: Patti Matthews

Labyrint

Bela, Czechia
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent

Laughlin Labyrinths

Laughlin, Nevada, 89029, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Designer: Wes Dufek

Pacific University

Forest Grove, Oregon, 97116, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    877-722-8648

White Oak Lavender

Harrisonburg, Virginia, 22801, United States
  • Availability
    Public
  • Situation
    Outdoor
  • Portability
    Permanent
  • Phone
    540-421-6345
  • Designer: Haushalter

1485 Craig Road
St. Louis
Missouri, 63146
United States

View Map View Map

Matthew Beyes, an exceptional scout from Mount Zion has accomplished a great feat by creating, designing and constructing a prayer labyrinth as his Eagle Scout project. The Prayer Labyrinth is 48 feet in diameter and sits 20 feet off of the parking lot. The total area of the Labyrinth is 1809 square feet. The pathway is made out of a dark colored gravel while the edging stone is a tan colored brick. It took a total of 135 man hours to build the Labyrinth while a total of 22 people worked throughout the day of May 9, 2015. The Labyrinth is a great way for the congregation and community to strengthen their spiritual needs and the labyrinth provides an avenue to make that happen.

  • Contact:

    Glenn Wintemberg
    Email: [email protected]
    View Website

  • Type:

    Medieval
    7-circuit

  • Availability:

    Public

  • Situation:

    Outdoor

  • Status:

    Permanent

  • Material:

    Brick Paver

  • Material Description:

    gravel

  • Designer:

    Matthew Beyes

  • Builder:

    Matthew Beyes and others, Eagle Scout Project

  • Wheelchair Accessible:

    No

  • Schedule:

    Always Open

  • Size:

    48 feet diameter

  • Date installed:

    May 2015